Discrete Manufacturing

Catch the revised drawing and the late part before they stop the job.

Revised drawings and supplier delays arrive by email while the ERP keeps the old revision and the old date. LevelOneAI connects each change to the jobs, POs and ship dates it affects, so you act before it turns into scrap or an idle line.

Where the work gets stuck

A customer emails Rev C, and the floor keeps cutting Rev B

Purchasing keeps buying material for a revision that's already changed

A supplier pushes a part three weeks, and the job stops halfway through setup

Expedites, overtime and idle operators that earlier warning would have avoided

Engineering Change Fallout & Job Impact Workflow

Stop the floor building to the old revision.

Customers email revised drawings after the order is booked, and the new revision sits in an engineer's inbox while machinists cut metal to the old one. It catches the change and shows everything it affects, before the parts hit the machine.

Doesn't PLM handle this? PLM manages the change inside engineering, but nothing tracks the jobs, POs and customer dates it breaks until each one is resolved.

Drawing 7712-HSG · Rev B → Rev C · 304 → 316 stainless

Pulled from Customer email · drawing ERP jobs, BOMs and POs Production schedule CNC and QA plans
  • Job 8021 · Lathe 3

    Hold recommended

    Customer drawing

    Rev C · 316 stainless

    ERP job router

    Rev B · 40 of 120 done

    Place engineering hold
  • PO 6650 · bar stock

    Old material

    Rev C material callout

    316 stainless

    ERP open PO

    304 stainless · ships Fri

    Flag to purchasing
  • CNC program and inspection plan

    Update needed

    Customer drawing

    Rev C

    Program and QA plan

    Still on Rev B

    Assign to engineering
  • SO 3307 · Apex Robotics

    Customer date

    Production schedule

    Rework adds 6 days

    ERP sales order

    Ships Nov 14

    Confirm new date

Found 4 items tied to Rev B

Approve hold

Illustrative example · sample company and data

What comes in

  • Updated drawing PDFs from customers
  • Internal engineering change notices
  • Change requests in email threads

What it does

  • Reads the part number, revision and material callouts
  • Finds every job, PO, program and customer order tied to the old revision
  • Puts the fallout in front of the lead engineer or plant manager

What goes into the ERP, after approval

  • Engineering hold on the job router
  • BOM lines moved to the new revision
  • Purchasing flagged to change open POs

What it changes

How the work changes

Measured in the pilot

  • Drawing change to hold decision

    3–10 days → Same day

  • Open jobs and POs checked

    Hit or miss → Every one

  • Fallout owned to a close

    Whoever notices → Every item, with an owner

The business results it drives

Which way each one moves, from where it typically is today

  • LowerScrap and rework3–6% of revenue
  • LowerJobs on an old revision8–12% of custom jobs
  • LowerWarranty and field failures1.5–3% of shipments

Illustrative ranges, not results: business results also depend on your team acting on what it finds. The pilot measures both against your own baseline.

What's at stake: a $40M plant

  • $40Mannual revenue, an engineer-to-order or configure-to-order plant
  • $1.6Ma year in scrap and rework at 4% of revenue
  • $480,000of it from changes that reached the floor late, if that's 30%
  • ~$48,000a year for every 10% of those changes caught in time

In sales terms · at a 5% margin

That $480,000 is the profit you would make on $9.6M of new sales. Every 10% you recover is worth about $960,000 in sales, with no new inventory to carry or customers to win.

Example assumptions, not results, so use your own numbers. A pilot measures the change against your baseline.

For the VP of Operations, plant manager and engineering manager. Holds, BOM changes and PO flags happen only after approval.

Material Shortage & Production Disruption Workflow

Know which job will stall, before the setup starts.

A supplier emails that a part is backordered three weeks, but the ERP still shows Tuesday, so the job starts and stops halfway through setup. It reads supplier and outside-processor updates, checks them against the schedule and recommends a fix before operators sit idle.

Doesn't MRP do this? MRP plans on the promise date in the ERP, while the delay sits in the buyer's email for days.

Disruption queue · this week

Pulled from Supplier and processor email ERP POs and orders Shop-floor schedule
  • Part 882-B · Delta Bearings

    Job will stall

    Supplier email · Oct 6

    Backordered 3 weeks

    ERP PO 7088

    Due Tuesday

    Shop schedule

    Job 4019 starts Monday

    Swap with Job 4032 (all material in stock)
  • PO 7120 · Kestrel Castings

    Partial

    Supplier email

    50 now, 150 in 30 days

    ERP PO

    200 due Oct 20

    Shop schedule

    Job 4044 needs 200

    Split the job
  • Job 3988 · Precision Plating

    Ship date at risk

    Plater's email

    "Still in process"

    ERP outside-op PO

    Due back Monday

    ERP sales order

    Ships Nov 3

    Ask for a firm date

3 jobs at risk

Approve fixes

Illustrative example · sample company and data

What comes in

  • Supplier acknowledgments and delay notices (email, PDF)
  • Partial-shipment and backorder updates
  • Status replies from outside processors

What it does

  • Reads the part, quantity and new promise date
  • Checks it against the shop-floor schedule and finds the jobs that will stall
  • Recommends a fix, like running a job that has all its material

What goes into the ERP, after approval

  • PO promise date updated
  • Job sequence changed on the dispatch board
  • Status request to suppliers who haven't confirmed

What it changes

How the work changes

Measured in the pilot

  • Supplier delay matched to the jobs it stalls

    At setup → Same day

  • Jobs checked per change

    Hit or miss → Every one

  • Risks ranked by dollars at stake

    By who shouts loudest → By jobs and orders exposed

The business results it drives

Which way each one moves, from where it typically is today

  • HigherOn-time in-full72–82%
  • LowerOperator idle time12–18% of hours
  • LowerExpedited freight$80K–$250K a year

Illustrative ranges, not results: business results also depend on your team acting on what it finds. The pilot measures both against your own baseline.

What's at stake: a $40M plant

  • $40Mannual revenue, 60 operators on the floor
  • 18,000operator hours a year lost to waiting at 15% idle time
  • $720,000of labor in that waiting, at $40 an hour
  • ~$72,000a year for every 10% of that waiting avoided, before counting freight

In sales terms · at a 5% margin

Every $72,000 of capacity you get back is the profit you would make on about $1.4M of new sales, without adding people or carrying more stock.

Example assumptions, not results, so use your own numbers. A pilot measures the change against your baseline.

For the production scheduler, supply chain manager and VP of Operations. PO dates, schedule changes and supplier requests happen only after approval.