Contain the bad lot and the late ingredient before they cost you the batch.

Lab results and supplier delays arrive by email and PDF before the ERP batch schedule knows. LevelOneAI connects each one to the batches, lots and shipments it affects, so QA and planning act before it turns into a dump, a recall or an idle line.

Where the work gets stuck

A COA fails spec, and nobody knows which batches already used the lot

QA digs through emails, lab reports and batch records to trace a single lot

An ingredient is ten days late, and the line is staged before anyone finds out

Short-shelf-life ingredients expire while the batch waits for a late one

Quality Exception & Batch Impact Workflow

Contain a bad lot in minutes, not a day.

When a COA fails a spec, a retest comes back out of range or a supplier sends a contamination notice, QA spends hours working out which batches used the lot and what's already shipped. It maps the whole blast radius as soon as the result arrives.

Doesn't the LIMS or QMS handle this? They hold the test results and procedures, while LevelOneAI connects a result to the batches, inventory and shipments it affects and follows each one until it's contained.

Raw lot 9021 · Lecithin · Northfield Ingredients · out of spec

Pulled from Supplier COA Lab email ERP batches and inventory Shipping schedule
  • Batch ticket 10492 · Vessel 3 · 10,000 gal sauce cook

    Hold required

    Supplier COA (PDF)

    Moisture 14.2% · spec max 12%

    ERP batch record

    Lot 9021 charged at 7:40 AM

    Place quality hold
  • Raw lot 9021 · Warehouse A · 40 drums

    Quarantine

    Lab email · retest

    Confirms out of spec

    ERP inventory

    Status: available

    Quarantine the lot
  • Finished lot 8810 · packed yesterday

    Shipment block

    ERP lot trace

    Made with lot 9021

    Shipping schedule

    Leaves today, 2 PM

    Block the shipment
  • Batch 10492 · rework or dump?

    QA decides

    Rework

    6 hours · about $3,800

    Dump (ERP batch cost)

    About $42,000

1 batch, 1 lot and 1 shipment affected

Approve containment

Illustrative example · sample company and data

What comes in

  • Supplier certificates of analysis (PDF)
  • Lab test results by email
  • Supplier quality alerts

What it does

  • Reads the lot code, the failing parameter and the expiry
  • Traces every batch, staged lot and shipment that used it
  • Shows rework against dump cost, for QA to decide

What goes into the ERP, after approval

  • Quality hold on the batch ticket
  • Lot status changed to quarantined
  • Supplier non-conformance report drafted for the debit

What it changes

How the work changes

Measured in the pilot

  • Failed COA to hold decision

    4–24 hours → Within the hour

  • Lot traced to batches and shipments

    3–5 days → Minutes

  • Containment owned to a close

    Calls and spreadsheets → Every lot, with an owner

The business results it drives

Which way each one moves, from where it typically is today

  • LowerBatch scrap and dumps2–5% of volume
  • HigherBatches saved by reworkAbout 30%
  • LowerTime to trace a lot for recallDays

Illustrative ranges, not results: business results also depend on your team acting on what it finds. The pilot measures both against your own baseline.

What's at stake: a $50M plant

  • $50Mannual revenue, a food, beverage or chemical plant
  • $1.5Ma year in batch scrap and dumps at 3% of production
  • $450,000of it from quality exceptions contained too late, if that's 30%
  • ~$45,000a year for every 10% of those contained in time

In sales terms · at a 5% margin

That $450,000 is the profit you would make on $9M of new sales. Every 10% you contain in time is worth about $900,000 in sales, with no new inventory or customers to win.

Example assumptions, not results, so use your own numbers. A pilot measures the change against your baseline.

For the QA director, plant manager and VP of Operations. Holds, quarantines and supplier reports happen only after approval, and rework decisions stay with QA.

Ingredient & Material Disruption Workflow

Know which batch will stall, before the line is staged.

A supplier emails that the lecithin is ten days late, but the ERP schedule doesn't change, so the team stages the line and finds out halfway through. It reads supplier updates, checks them against the batch schedule and shelf life, and recommends a fix before the line sits idle.

Doesn't MRP do this? MRP plans on the dates in the ERP, while the delay sits in the buyer's email for days.

Disruption queue · this week

Pulled from Supplier email and tickets ERP POs and inventory Batch schedule
  • Organic lecithin · Harlan Ingredients

    Batch will stall

    Supplier email

    Delayed 10 days

    ERP PO 5502

    Due Friday

    Batch schedule

    Batch 3021 cooks Monday · needs 500 kg

    Advance Batch 3045 (all ingredients in stock)
  • Glycerin · PO 5518 · Calder Chemical

    Partial

    Delivery ticket

    200 gal, not 1,000

    ERP PO

    1,000 gal due Oct 22

    Batch schedule

    Batches 3030–3033 need 900 gal

    Re-sequence Line 2
  • Strawberry purée · lot 7740

    Spoilage risk

    ERP inventory

    Expires Oct 31

    Batch schedule

    Batch 3040 moved to Nov 2

    Pull Batch 3040 forward

3 batches at risk

Approve fixes

Illustrative example · sample company and data

What comes in

  • Supplier acknowledgments and delay notes (email, PDF)
  • Partial delivery tickets
  • Revised delivery dates for raw ingredients

What it does

  • Reads the ingredient, quantity and new arrival date
  • Checks it against the batch schedule and shelf life
  • Recommends a fix, like advancing a batch that has everything in stock

What goes into the ERP, after approval

  • Batch sequence changed on the dispatch board
  • PO dates and expected inventory updated
  • Request to suppliers for unconfirmed shipments

What it changes

How the work changes

Measured in the pilot

  • Shortage matched to the runs it affects

    When the line is short → Same day

  • Runs checked per change

    Hit or miss → Every one

  • Risks ranked by dollars at stake

    By who shouts loudest → By runs and orders exposed

The business results it drives

Which way each one moves, from where it typically is today

  • LowerUnplanned downtime8–14% of hours
  • HigherOn-time in-full78–85%
  • LowerEmergency sourcing$100K–$350K a year

Illustrative ranges, not results: business results also depend on your team acting on what it finds. The pilot measures both against your own baseline.

What's at stake: a $50M plant

  • $50Mannual revenue, about $8M a year in raw ingredients
  • $200,000a year in emergency sourcing and rush freight
  • 10%of operating hours lost to unplanned downtime
  • ~$20,000a year for every 10% of the sourcing premium avoided, before counting downtime

In sales terms · at a 5% margin

That $200,000 in emergency sourcing is the profit you would make on $4M of new sales. Every 10% you avoid is worth about $400,000 in sales.

Example assumptions, not results, so use your own numbers. A pilot measures the change against your baseline.

For the plant scheduler, supply chain manager and VP of Operations. Schedule changes, PO updates and supplier requests happen only after approval.

Start with one workflow.

Pick the workflow that costs you the most. We'll show you a workflow on work like yours.